- Model
- 2018
- Dealer Name
- Marrikar Moters Ltd.
- Company Name
- Eicher Motors Ltd
- Loss Amount
- 170000
- Ratings
- 5.00 star(s)
- Opposite Party Address
- Registered & Manufacturing Address:
Royal Enfield (Unit of Eicher Motors Ltd.)
Royal Enfield – Thiruvottiyur Plant
#136/1, Old Mahabalipuram Road (OMR)
Perungudi, Chennai – 600096
Tamil Nadu, India
Corporate Office (Chennai):
Royal Enfield
A-96, 2nd Avenue, Sidco Industrial Estate
Ambattur, Chennai – 600098
Tamil Nadu, India
I, the complainant, respectfully submit this written objection against the Commission Report dated 10.02.2020 filed in CC No. 382/2019 before the Hon’ble District Consumer Disputes Redressal Forum, Thrissur. The said report is factually incorrect, technically flawed, and procedurally invalid. The inspection was conducted without a work memo or a copy of the original complaint, violating basic transparency and legal standards. The test itself was superficial—limited to a mere 2 km ride—and lacked any scientific diagnostic procedures such as engine teardown or compression tests. The report provides vague and speculative conclusions, especially the unverified assumption that engine noise reduces due to thermal expansion. Furthermore, crucial aspects such as premature component replacements (e.g., silencer and ignition coil), ongoing service issues, and the absence of factory noise standards were completely ignored. The comparison made with a reference bike sourced from the opposite party, without independent oversight, further raises serious concerns of bias.
The detailed consumer complaint, the Commission Report, and this Objection with point-wise counter statements are all attached herewith for the Hon’ble Forum’s kind perusal and consideration. I humbly request that the report be rejected in its entirety, that a fresh and independent technical inspection be ordered, and that appropriate directions and reliefs be granted in the interest of justice.
The detailed consumer complaint, the Commission Report, and this Objection with point-wise counter statements are all attached herewith for the Hon’ble Forum’s kind perusal and consideration. I humbly request that the report be rejected in its entirety, that a fresh and independent technical inspection be ordered, and that appropriate directions and reliefs be granted in the interest of justice.